The solar field team
Records mounting, module installation, cable work and supporting photos against the correct roof area.
Explore this roleConnect the installation plan to what arrived, what the crew recorded and what still needs a qualified review before handover.
Bengaluru · Commercial rooftop solar
Demonstration project · Work in progress
Prompt ideas require a connected assistant and permitted access. Review proposed changes before saving.
Screens captured from NIYAM on 9 September 2026. Names, amounts and projects are fictional. Site photos inside the demo are AI illustrations.
For rooftop solar contractors, project coordinators and field teams managing installation records across active sites.
Records mounting, module installation, cable work and supporting photos against the correct roof area.
Explore this roleReviews stages, module receipts, supplier records, installer bills and open actions.
Explore this roleReceives selected progress and testing records while technical acceptance remains with qualified people.
Explore this roleSelected progress and reports keep your client informed. Supplier bills and internal expenses stay with your team.
How sharing works
Connect assistance to your site context. Check the records, review the proposal and confirm the work you want saved.
Explore connecting ChatGPT to permitted NIYAM workflows through MCP.
ChatGPT connection guideConnect supported NIYAM tools for scoped work. Check the source, review the action and verify its result.
Codex connection guideConfigured bill extraction and report drafts support review. General internal-agent actions are not yet qualified.
See bill reviewCore site work has a complete manual path. New integrations are agreed by scope.
How MCP connects the toolsNIYAM manages project records and review. It does not calculate energy yield, monitor live equipment, determine subsidy eligibility, approve grid connection or replace electrical engineering and statutory decisions.
Review access and controlsYes. Define the survey, mounting, module, cabling, testing and handover stages that match your delivery plan, then assign the current work and evidence to the responsible people.
Record confirmed receipts and supported site usage as separate material movements. Sunrise shows 54 modules received and 42 recorded as installed, leaving 12 in the site balance for the team to physically verify.
No. Use your specialist monitoring and design systems for live performance, yield modelling and electrical analysis. NIYAM keeps project execution, evidence, costs and review records together.
Qualified engineers, the client, utility and statutory authorities make the required technical and legal decisions. NIYAM can retain submitted files and the human review trail without claiming approval.
Yes. Share selected reviewed progress and documents through the client view. Supplier bills, reimbursements and internal commercial records stay within authorised team access.
A connected assistant can prepare a source-linked list where supported. Your team checks access, technical meaning and completeness before saving or sharing any proposed action.
Add the current plan, bring in your team and record the next day’s work. For an existing project, agree opening stock and balances before you carry them forward.
Plan your first site