Trade supervisors
Record area work, materials, observations and evidence within the responsible discipline.
Explore this roleBring electrical, HVAC, plumbing and fire-system records into one accountable project flow while each technical decision keeps its authorised owner.
Chennai · Commercial building services
Demonstration project · Work in progress
Prompt ideas require a connected assistant and permitted access. Review proposed changes before saving.
Screens captured from NIYAM on 9 September 2026. Names, amounts and projects are fictional. Site photos inside the demo are AI illustrations.
For MEP contractors, coordinators and supervisors managing multiple trades, materials and testing records.
Record area work, materials, observations and evidence within the responsible discipline.
Explore this roleReviews cross-trade actions, supplier records, costs and readiness before ceiling closure.
Explore this roleReceives selected progress and testing records for the decisions assigned to authorised reviewers.
Explore this roleSelected progress and reports keep your client informed. Supplier bills and internal expenses stay with your team.
How sharing works
Connect assistance to your site context. Check the records, review the proposal and confirm the work you want saved.
Explore connecting ChatGPT to permitted NIYAM workflows through MCP.
ChatGPT connection guideConnect supported NIYAM tools for scoped work. Check the source, review the action and verify its result.
Codex connection guideConfigured bill extraction and report drafts support review. General internal-agent actions are not yet qualified.
See bill reviewCore site work has a complete manual path. New integrations are agreed by scope.
How MCP connects the toolsNIYAM coordinates project execution records. It does not design building systems, detect clashes, control live equipment, grant statutory approval or certify installation and commissioning results.
Review access and controlsYes. Use clear work areas, milestones, tasks and responsible people for each discipline. The shared site context helps the coordination team see dependencies without removing trade ownership.
No. Use your design and coordination tools for technical clash detection. Record the reviewed issue, responsible response and supporting evidence in NIYAM so the follow-up remains accountable.
Record confirmed receipts and supported usage by site. Riverbend shows 420 metres of cable received and 260 used, leaving 160 recorded for physical verification.
No. It retains submitted files and the human review trail. Qualified engineers, consultants, clients and authorities remain responsible for testing, certification and acceptance.
Yes. Supported roles and site assignments control internal views. Client-facing records include only the progress and documents your authorised team selects for sharing.
A connected assistant can prepare source-linked findings where supported. The MEP coordinator checks the technical context and proposed action before anything is saved or shared.
Add the current plan, bring in your team and record the next day’s work. For an existing project, agree opening stock and balances before you carry them forward.
Plan your first site